Oil Well Workover Basics: Restoring Production on Existing Wells
A workover is major work on an existing well, usually intended to repair a mechanical problem, clean out the wellbore, or recomplete the well in a different interval. It is more involved than routine pumping, and it is one of the main tools operators use when a well has stopped producing as it should — or has stopped producing at all.
This article covers what a workover generally involves, why an operator might recommend one, and the questions a well owner should ask before approving the spending. It is a general overview, not a diagnosis of any particular well, and it is not a promise that a workover will restore production.
What “workover” usually means
People in the field use “workover” for a range of jobs. In broad terms, it means taking a well out of routine production and using a workover rig or similar equipment to work inside the wellbore. Common examples include:
- Repairing or replacing failed downhole equipment, such as a pump, rods, or tubing
- Cleaning out scale, sand, paraffin, or other restrictions
- Isolating a problem interval and repairing casing or a leak, when that is feasible
- Recompleting the well in another zone
- Preparing a well for conversion, shut-in, or, in some cases, plugging
A routine pulling job or a chemical treatment may be smaller than a full workover. The useful distinction for an owner is not the label. It is whether the job requires a significant AFE, downtime, and a clear description of the objective, the risks, and the alternatives — including doing nothing, or plugging the well.
Why an operator may recommend a workover
Production declines over time in most wells. That alone does not mean a workover is justified. An operator typically looks for a specific problem that work might reasonably address, such as:
- A sudden drop or stop in production that points to a mechanical failure rather than ordinary decline
- Evidence of a hole in tubing, a failed pump, or a wellbore restriction
- Water, gas, or mechanical conditions that might be improved by isolating or changing the producing interval
- Safety, environmental, or integrity issues that have to be repaired regardless of the production outlook
A candid operator will also say when a workover is unlikely to help. If the reservoir is depleted, if remaining reserves are unlikely to pay for the job, or if the well’s mechanical condition makes a successful repair unlikely, the better conversation may be about continued decline, shut-in status, or plugging. For Texas plugging and inactive-well rules, see Texas Well Plugging and Abandonment Requirements.
What the job typically looks like from an owner’s chair
You should receive a written authority for expenditure, or a similar cost estimate, before major work begins. That estimate should describe the proposed procedure, the objective, the main risks, and a cost range, including contingency if the operator expects unknowns once the well is opened.
During the job, the well is usually shut in. A rig or pulling unit is moved in, and the crew works through the agreed steps. Findings in the hole sometimes change the plan, which is why you want to know how a change in scope will be called — and who pays for it — before the rig is on location. After the work, early production is not always a reliable picture of how the well will hold up. Ask how results will be measured and what happens if the well does not respond.
Questions to ask before you approve the AFE
- What problem are we trying to fix, and what evidence points to that problem?
- What is the procedure, and what are the main things that can go wrong?
- What is included in the estimate, what is excluded, and how will overruns be handled?
- What production or integrity outcome would count as success, and what happens if the job does not work?
- Are there lower-cost diagnostic steps that should be tried first?
- How does this option compare with continued operation as-is, a shut-in, or plugging?
- Who will supervise the work in the field, and how will you be updated?
These questions are reasonable whether you operate the well yourself or use a contract operator. If you do not have field staff, this is often the moment to hire a contract operator.
How Mokan Operating approaches workover planning
Mokan Operating, based in Spicewood, Texas, helps well owners plan and supervise workovers and related field work. We start with the well’s history, mechanical condition, and regulatory status, and we discuss the objective in plain language — repair, cleanout, recompletion, or a recommendation that the job is not justified.
We will not invent a production forecast in order to sell a workover. If the well is a candidate for work, we will tell you what we propose and why. If it is not, we would rather say so and talk about the alternatives.
Talk with us about a well that needs work
If you have a well that is down, declining unexpectedly, or being proposed for a workover, call Mokan Operating at (325) 773-9073 or email info@mokancapital.com. Share the well or lease name, the county, and what has changed. We will tell you what information we need to review it with you.
Mokan Operating is in Spicewood, Texas. If you are instead looking for educational background on working-interest investing, visit American Oil Investing. Investment inquiries, if any, are handled by Mokan Capital.
This article is general information, not a recommendation to perform a workover on any well, and not a promise that work will restore production or be economic. Actual procedures, costs, and results depend on the well and on conditions found in the field. Consult your operator and advisors before approving work.